Leased lines in Salford
For businesses where upload and uptime are the product, a dedicated circuit with guaranteed symmetric speeds and an SLA you can actually point at.
Sound familiar?
When the work involves pushing large files out to clients against a deadline, the limits of ordinary broadband become obvious quickly.
A provisional price based on records becomes a very different number once an engineer looks in the chambers and finds the duct blocked, collapsed, or not where the plans say.
Where the cable crosses land or a building you do not own, written permission is needed, and the people granting it are rarely in a hurry.
Delivering files, uploading rushes and backing up to cloud storage all go outwards, and business broadband gives you a fraction of the download figure to do it with.
In a multi-tenant office at the Quays, access and riser permissions govern the timescale as much as the engineering does.
A leased line is months rather than weeks. Businesses that discover that after committing to new premises have a difficult few months ahead.
Businesses assume a business service comes with a guaranteed fix. On standard broadband it usually does not, and Ofcom automatic compensation covers residential customers only.
On the ground in Salford
Salford produces two quite different cases for a leased line.
Around MediaCityUK and the Quays, it is almost always about upload and deadlines. Media, creative and professional businesses spend their day pushing large files outwards to clients, into cloud storage and onto platforms, and business broadband gives you a small fraction of the advertised download figure to do that with. A leased line is symmetric, so upload matches download, and for this kind of work that single property is usually worth more than everything else combined. The second half of the argument is the SLA, because when a client deadline is the product, a best-effort connection is not a defensible position.
The practical constraint is the building. In a multi-tenant office the ducts and the riser belong to the landlord, and a wayleave has to be granted before anything is installed. We start that early because it usually sets the timescale.
Towards Trafford Park, the case is different again: large sites where the connection is straightforward and distributing it across the operation is the actual work.
We are around forty minutes along the M62.

What we do
Most of the value is in the work before the order goes in, because that is while the surprises are still cheap.
Why Synergy Max
Common questions
Because everything you deliver goes outwards. Sending files to clients, uploading rushes, backing up to cloud storage and hosting video calls all consume upload, and most business packages give you a small fraction of the download figure for it. A leased line is symmetric, so a 500Mb circuit is 500Mb in both directions. For a media business that is usually the single biggest practical difference there is.
Typically three to four months, and longer where a wayleave or street works permit is involved. If you are moving premises, start the conversation as soon as the lease is agreed rather than once you have the keys, because the survey and the permissions run to their own timetable no matter how urgent it is for you.
It is a one-off charge raised when the physical build costs more than the construction allowance already inside the standard price. Blocked duct, a long run to the nearest fibre point or highway digging are the usual causes. It always comes to you in writing with a breakdown before anything is ordered, and you can decline it. We read the desktop survey first and warn you if it looks likely.
The landlord or their managing agent, not you. It grants the carrier the right to run cable through land or parts of a building you do not control. It usually costs little or nothing and it is regularly the longest single step, which is why we open that conversation at the start rather than when the engineer turns up.
This is the real difference. A leased line carries a contractual SLA with a defined fix time and service credits if it is missed. Standard business broadband generally does not, and the Ofcom automatic compensation scheme covers residential customers only, so business lines sit outside it entirely. If uptime genuinely matters, that distinction is worth more than the headline speed.
The rest of what we look after for businesses across Salford.
Ask us
Send this and a real person will reply. No call centre, no obligation, and we will tell you honestly if we are not the right fit.
Send us the postcode and we will check what the survey records show, price it across the market, and tell you honestly whether a leased line is right or whether full fibre would do the job.